FlyWater

Featured

Walden Hollow Stream Improvement Project



FlyWater was hired to complete stream improvements on a roughly 1.25 mile private stretch of the Colorado River downstream of Lake Granby. This property had issues with width-to-depth ratios in the stream, leaving limited trout habitat…

Read more about the Walden Hollow Stream Improvement Project here →


Granby Diversion Fish Passage and Ditch Improvement Project



FlyWater teamed with Freestone Aquatics to design, then later build, improvements to the Town of Granby’s existing water supply diversion on the Fraser River to allow for fish passage of both trout and native Mottled Sculpin. Funding for…

Read more about the Granby Diversion Fish Passage and Ditch Improvement Project here →


South Park Riparian Reconnect Projects

Completed BMS

Completed BMS



FlyWater was hired as the constructor for the Riparian Reconnect Team (Gillilan Associates, Inc, EcoMetrics and Johnson Environmental) to build two projects on private ranches in South Park, Colorado. We worked along side designers in the…

Read more about the South Park Riparian Reconnect Projects here →


Big Thompson River US-34 Flood Recovery

A before and after comparison of the Big Thompson River restoration work completed spring of 2018.

A before and after comparison of the Big Thompson River restoration work completed spring of 2018.



Severe flooding occurred in the Big Thompson Canyon during September 2013 and emergency repairs were completed in November 2013. The Colorado Department of Transportation (CDOT) is now implementing more permanent engineered design within the…

Read more about the Big Thompson River US-34 Flood Recovery here →


Water Valley and Pelican Lakes Gold Course Bank Stabilization

Installing geotextile material beneath boulder toe for bank stabilization.

Installing geotextile material beneath boulder toe for bank stabilization.



The Cache la Poudre River flows through the Water Valley property in Windsor, CO and caused bank erosion, specifically along sections of the Pelican Lakes Golf Course; this erosion was exacerbated during the September 2013 historic flooding…

Read more about the Water Valley and Pelican Lakes Gold Course Bank Stabilization here →


Yampa River Irrigation Delivery and Habitat Improvement

A completed boulder toe installed along the Yampa River for bank stabilization.

A completed boulder toe installed along the Yampa River for bank stabilization.



The Gibralter Ditch irrigation system on the Yampa River was previously controlled by push up dams to direct water delivery; however increased sediment and bedload had caused the river to become destabilized and affect water resource…

Read more about the Yampa River Irrigation Delivery and Habitat Improvement here →


Frying Pan River Habitat and Fishery Improvement

Completed stretch of the Frying Pan River with cut pools and placed habitat rocks to encourage increased fish populations.

Completed stretch of the Frying Pan River with cut pools and placed habitat rocks to encourage increased fish populations.



The goal of this project was to create a section of river with improved aquatic habitat and fishability in the Frying Pan River near Basalt, CO. FlyWater completed assessment, permitting, design, and construction to create increased aquatic…

Read more about the Frying Pan River Habitat and Fishery Improvement here →


Lefthand Creek Flood Recovery

Installation of a large bank stabilization wood structure on the Ranch reach

Installation of a large bank stabilization wood structure on the Ranch reach



FlyWater, inc worked along side Iron Woman Construction and Wildlands Restoration Volunteers to improve and restore multiple reaches of Lefthand Creek to the North of Boulder, CO for the Lefthand Watershed Oversight Group (LWOG). The focus…

Read more about the Lefthand Creek Flood Recovery here →


Fall River Flood Recovery

Before and after of Phase 1

Before and after of Phase 1



FlyWater, inc. worked directly with a design team (Otak) to develop a restoration strategy to re-establish form and function, and to mimic the pool-rife channel-type appropriate to Fall River for the Town of Estes Park. To meet resiliency…

Read more about the Fall River Flood Recovery here →


Saint Vrain Creek Channel Flood Recovery

Constructed channel allowing for greater floodplain conveyance and increased habitat diversity.

Constructed channel allowing for greater floodplain conveyance and increased habitat diversity.



FlyWater, inc. executed construction to repair and reclaim the St. Vrain River through the Town of Lyons following flooding events of 2013.  The scope of work included aquatic habitat installation, bank stabilization, and installation of…

Read more about the Saint Vrain Creek Channel Flood Recovery here →